Austrian Parliament Vienna

General refurbishment of a heritage building

Austrian Parliament Vienna

General refurbishment of a heritage building

Projekt
Austrian Parliament Vienna
Bauherr

Republic of Austria

Architekt

Jabornegg & Palffy, Wien

BGF
55.000 m²
Leistungsbereiche
MEP + Infrastructure
Leistungsphasen

1 - 3

Planungszeit

2014 - 2018

Bauzeit

2017 - 2020

Besonderheit
ÖGNB Gold, Klima Gold
The Austrian Parliament decided to undertake a comprehensive renovation of its 130-year-old building. The goal was to repair existing damage and sustainably restore the structure. Additionally, operational, procedural, and functional enhancements were planned to ensure compliance with modern safety, fire protection, and hygiene standards.

In a Europe-wide tender process, the Vienna-based consortium Jabornegg & Palffy, in collaboration with the engineering firm AXIS, secured the contract for the renovation, estimated to cost over 300 million Euros. KBP contributed its extensive experience throughout both the competition and design phases.

As part of the overarching technical infrastructure, the renovation includes the use of renewable energy for the building's cooling system. To further enhance supply security, an additional medium-voltage power supply from a second transformer station is planned. Inside the building, the electrical supply systems will be fully designed with redundancy.

No items found.
No items found.
Image credits: PGSG | ZOOM VP | KBP
Project
Austrian Parliament Vienna
Client

Republic of Austria

Architect

Jabornegg & Palffy, Wien

Area
55.000 m²
Services
MEP + Infrastructure
Phases

1 - 3

Design

2014 - 2018

Construction

2017 - 2020

Specialty
ÖGNB Gold, Klima Gold